Duration per unit at Depot

This value represents the time required by the resource to load or unload one unit of product at the depot. The entered time is multiplied by the quantity to be loaded or unloaded, depending on the route type. This constraint applies only to the Quantity 1 constraint of the visit and does not apply to the other 23 available quantity types.

Format: HH:MM, HH:MM:SS, or MM

Example: If the Loading/Unloading duration per unit at depot is set to 00:02 and the quantity to be loaded (Quantity 1) is 10 units, the total loading or unloading time at the depot will be 20 minutes.